The Preferred Corridor - McCowan

 

The feedback and technical analysis support McCowan as the preferred corridor:

  • SRT remains operational during construction
  • Received strong public support
  • Least constructability/infrastructure impacts = reduces risks to costs

 

View Corridor Evaluation Summary

 

 

 

 

© 2015 Line 2 Subway Scarborough, City of Toronto and Toronto Transit Commission

Privacy / Accessibility

 

Site by AECOM